BLDG 101 Renovations
Client: NAVFAC MIDLANT
Award Date: 09/30/2012
Completion Date: 05/14/2013
Located in a remote location, this complex and fast-track Design-Build project required substantial architectural, HVAC, plumbing, electrical, telecommunications and intruder detection systems (IDS) renovations to support the operational and security requirements for our government client. The Syncon Design-Build (DB) team was able to support the construction methods that were in strict accordance with high-security design standards to renovate an existing space (5,000 SQFT) to fully operational facility
Select demolition cleared the space of existing flooring, mechanical, electrical and IDS (coordinated with NAVSEA). Wall partitions and numerous security door assemblies were upgraded. The HVAC and associated plumbing systems were redesigned and installed with redundant and sustainable Computer Room Air Conditioning (CRAC) systems to support the load requirements of the new server systems, Power Management Modules (PMM), new security detection systems and functional requirements of the new operations center. Additional mechanical and electrical infrastructure was installed beneath the new Raised Access Flooring (RAF), and life safety systems along with exterior Lightning Protection Systems (LPS) were also upgraded in coordination with DoD and Other Government Agency requirements.
Per DoD security guidelines, all operational spaces received third party testing resulting in government accreditation on the first certification attempt. Upon completion the client stated:
Your team’s performance in this project is commendable and demonstrates the professionalism and commitment to your company and would be recommended to future projects in both the Navy as well as the civilian community.