Project Details

  • City: Virginia Beach
  • State: Virginia
  • Project Amount: $2 Million
  • Bid Type: Negotiated
  • Completed: 2020

Scope

The tower was designed by VMDO and built by another large GC firm. Chris Brandt (Syncon Business Development) was the Executive Vice President at another large GC firm during the entire design and construction. Centrally located concrete and structural steel structure that houses the campus bell and spot lighting systems.

Challenge

The challenge for this project was the scaffolding required to erect the actual precast and steel structure of the Tower.

Solution

Safety being of primary concern, we hired a specialty scaffolding company to design, fabricate and install the scaffolding for a structure that was 25′ in diameter and 125′ tall. This required close inspection of every nut, bolt, brace, and working platforms that were required for the scaffolding. The result was a successful installation of scaffolding and erection of the actual Tower structure.

Project Gallery

Project Details

  • City: Virginia Beach
  • State: Virginia
  • Project Amount: $2 Million
  • Bid Type: Negotiated
  • Completed: 2020
Neon safety vest with company logo on construction blueprints, highlighting engineering and safety themes.
Get Started
Turn Ideas Into Action. Start Your Project Today.