Army Base Treatment Plant Administrative Building Renovation

SYNCON News Center
Neon safety vest with company logo on construction blueprints, highlighting engineering and safety themes.
Get Started
Turn Ideas Into Action. Start Your Project Today.

Location: Norfolk, VA

Project Team

  • Owner: Hampton Roads Sanitation District (HRSD)
  • Architect: Guernsey Tingle Architecture
  • General Contractor: SYNCON LLC

SYNCON Team

  • Project Executive: Scott Turner
  • Project Manager: Sean Foreman
  • Superintendent: Steven Murray
  • Project Manager Assistant: Kerri Payne

Project Specifics

  • Project Scope: The renovation of an existing two-story, approximately 9,300-square-foot Administration Building, including a 2,500-square-foot office and laboratory addition, and renovation of the existing approximately 2,000-square-foot E&I Building, including office, locker room, and restroom modifications at the Army Base Treatment Plant.
  • Project Cost: $9.6 Million
  • Project Duration: 23 months – completed July 2026

Client Satisfaction Statement

“SYNCON served as the General Contractor for the Hampton Roads Sanitation District’s (HRSD) Army Base Treatment Plant Administration Building Renovation project – which consisted of the renovation of an existing two-story, approximately 9,300 square foot Administration Building, including a 2,500 square foot office and laboratory addition, as well as the renovation of the existing approximately 2,000 square foot E&I Building, including office, locker room, and restroom modifications. The total contract value was approximately $9,600,000 and construction was completed between September 2024 and July 2026.

Throughout the project, SYNCON demonstrated exceptional professionalism, technical expertise, and a strong commitment to quality. Their team consistently maintained effective communication, adhered to project schedules, and proactively addressed challenges as they arose. They worked collaboratively with HRSD, the design team, and other project stakeholders to ensure successful project delivery.

The project was completed on time and within budget, meeting or exceeding our expectations for quality, safety, and overall performance.”

– Tim Marsh
Project Manager – Design & Construction Division
Hampton Roads Sanitation District

Project Gallery

  • Building Exterior
  • Conference Room
  • Electrical Room
  • Breakroom
  • Locker Room
  • Control Room
  • Laboratory
Modern control room with multiple monitors displaying data analytics in a high-tech facility.
Control Room
Red brick industrial building with adjacent parking lot, featuring parked vehicles and overcast sky.
Building Exterior
Empty office room with gray carpet, blue accent wall, and closed blinds on windows.
Conference Room
Office break room with blue chairs around square tables and a kitchenette along back wall
Breakroom
Modern locker room with blue lockers, sinks, and hygiene products in a clean, well-lit environment.
Locker Room
Electrical room with transformers, circuit breakers, and conduit pipes for building power management.
Electrical Room

Project Video

A 1:32 video showcasing the building exterior and interior renovations.

Alt text: Solid white background, no visible content or elements.

Written By SYNCON LLC

Commercial & Government Contractor

SYNCON is a mid-sized, service-disabled, minority-owned general contractor based in Chesapeake, Virginia, specializing in government, commercial, and municipal construction projects across Virginia and Northern North Carolina. Established in 2009, we have completed over 350 projects totaling more than $250 million in contracts.

Recent News Posts

Stay upto date with the latest news from SYNCON

    Start Your Project with Us

    Man in construction vest and hard hat at groundbreaking ceremony with team and excavator in the background.
    Discuss your project needs with our experts and begin your construction journey with SYNCON.