First-floor concrete placement at P 160 project
We placed 313 cubic yards on top of a 4’ thick “eco-foam” substrate (read our technical Blog next month to find out more about Eco-foam).
All structural concrete has now been placed and the exterior structural studs will start to wrap and enclose the building.